
|
|
|
|
|
|
The following are some articles I published in Cost Accounting, "The International Journal of Cost Estimation, Cost/Schedule Control, and Project Management," which is the official journal of the International Association for the advancement of Cost Engineering (AACE). I include articles of mine that AACE published in the proceedings of their Annual meetings. I also include an article I wrote for the Journal of Infrastructure Systems, the official journal of the American Society of Civil Engineers (ASCE). There are several articles concerning FAA matters. All the articles in these journals are given jury review before they are published, and the articles I wrote concerning the FAA were given to FAA internal clearance procedures as well. It usually takes 1-3 years to get an article published.
|

|
|
|
|
|
|
|
|
The Association for the Advancement of Cost Engineering International (AACE) Directory of Association positions,
and the Association’s 1st Annual Technical Excellence Award, that was given
to me - Cost Engineering 11-99

|
Fire Safety Upgrades in Airport Control
Towers - the Journal of Infrastructure systems 9/95, from the American Society of Civil Engineers (ASCE)

|
The US Federal Aviation Administration’s Airspace System in a Changing
World - A professional
overview of the infrastructure of the National Airspace System (NAS) - 8/97 Cost Engineering 
|
|
Letters to the Editor from Cost Engineering 11/97

|
Free Flight - Keeping Up with Changing Times Pre-9/11 overview of Free Flight considerations 11/98 Costt Engineering

|
Reimbursement Agreement Overview. Airports internal guide to
the process in the 6/91 issue of
Airportopics

|
|
Total Cost Management Framework – A process for
Applying the Skills and Knowledge of Cost Engineering.” A guide to TCM , published by
AACE, to which I contributed the articles
Resource Planning &Procurement Planning

|
Recommended Practices and Standards: A Process
Overview – A guide to RPS. From Cost Engineering, 7/2000

|
Schedule Hierarchy – An Overview A guide to formal project scheduling from Cost Engineering, 4/98

|
|
. The Challenge of
Change – The month’s Feature Article
from Cost Engineering, 4/98

|
Fast Track Management for Projects with Multiple Sites - an in-depth guide from Cost Engineering,
5/94

|
The Role and Operation of Multinational Corporations from Proceedings from the
38 th annual meeting of AACE , 6/94

|
|
Risk reduction performance measuring system
(RRPMS) from the Proceedings from the
39 th annual meeting of AACE,
6/95

|
AACE's official Professional
Practice Guide to Cost Engineering in Aerospace and Aviation, and official Professional Practice to Planning
and Scheduling – I was AACE’s Editor for these CD volumes. 6/2000

|
Advertisements concerning AACE
International’s “Professional Practice
Guide” CD series - from Cost Engineering, 6/2000

|
|
AACE’s Technical Director Election Profile from
Cost Engineering-,12/96

|
|

|
Click to download ADOBE's free reader program
|

|
|
|